![]()
JAY
FORSE 1466 Scott Canyon Lane, Castle Rock, CO
80104 | 323.314.9255
|
SUMMARY
Received awards for outstanding contribution and
completion of managed projects under budget, on time and with a perfect safety
record. Expertise in managing large and
small-scale projects and project teams in both corporate and private sectors. Ten years of advancing responsibility
managing a diversity of team structures from engineers, to trades personnel and
support staff.
10/04 to 10/06 The
Oasi Group
Project Manager (Consultant)
· Coordinated and managed
design and pre-construction efforts with engineers, architects, city officials
and field personnel to ensure timely approval of plans, permits and design
changes.
·
Developed
and proliferated scopes of work for bidding to all trade companies. Coordinated the bidding process with the
field superintendent and the final trade selection process with the Oasi team.
· Performed as the company
liaison between customers, builders and Oasi to ensure client satisfaction, at
all levels, without escalation.
01/00 to
09/02 Intel Corporation
Tool Install Project Manager (300mm C4 and Planar)
· Managed budgets up to
$20,000,000 for C4 and Planar tool installation modules.
·
Coordinated
and managed 150 vendor, trade, and construction personnel on a daily basis.
·
Oversaw
schedule management of design, pre-fac and installation for approximately 30
tools simultaneously.
·
Managed,
coordinated and developed scope, schedule and budget for all assigned projects.
·
Directed
Functional Area Teams in design efforts, budget estimation and resource
allocation.
· Performed validation
reviews at vendor sites internationally to insure accurate install design.
01/99 to
01/00 Intel Corporation
Install Engineer (300mm C4)
· Engaged vendor field
service and factory design engineers to aide in install package design.
· Oversaw design team from
initiation to completion of design packages.
·
Coordinated
pre-fac, dock and install through city safety level sign-off including
construction coordinator, trades, area coordinator, PM, PTD technicians, safety
rep, BCD and GSS.
·
Directed
Functional Area Teams in design efforts.
·
Conducted
post-installation record drawing reviews and facilitated daily whiteboard
reviews.
· Reviewed bill of
materials for integrity and accuracy.
· Trained technicians and
delegated tool install assignments.
01/95 to
01/99 Intel Corporation
Tool Owner of 50+ Tools in
Tasks
relating to all toolsets:
· Directed tool
development for new technologies.
·
Facilitated
tool maintenance with vendor support to insure contracted up-time.
·
Coordinated
upgrades, preventative maintenance, relocations, installations and tool quals.
·
Authored
and edited technical specs for new software and procedures.
·
Trained
all tool users.
Tasks relating to SEM
and Review Stations:
· Evaluated and analyzed
excursions and process flow problems for customers in the yield group.
· Participated in working
and development groups.
· Managed tool and
excursion databases.
· Performed networking of
SEM and EDS systems for integrated software and KLA databases.
· Coordinated networking
of 6 review stations with KLA/Tencor tools and databases.
SOFTWARE PROFICIENCIES
|
·
MS Windows XP ·
MX Word ·
MS Excel ·
MS Powerpoint ·
MS Outlook ·
MS Project ·
Quickbooks |
·
Adobe Photoshop CS ·
Adobe Illustrator CS ·
Go Live ·
Adobe Imageready ·
Adobe Acrobat 6.0 ·
Mac OS ·
SAP |
PATENT
SUBMITTED & AWARD RECEIVED
2000 Patent for Manual Wafer Marker for bare wafer SEM
review
2002 Outstanding Contribution Award for D1C
300MM Tool install project
(All
projects 100% on-time, under-budget and with a perfect safety record)
2002 Perfect safety record for tool
installations managed under D1C 300MM construction projects
EDUCATION
05/93 B.S. in Chemistry